What should a bid package to Kairos Foundation Group include?
Required
- Plans — current drawing set (architectural, structural, and civil/grading at minimum)
- Specifications — project specs relevant to foundation, structural concrete, and sitework scopes
- Geotechnical report — if none exists yet, tell us; it changes how we can scope the work
- Bid due date — the exact date and time, and delivery method
Include if available
- Addenda — every addendum issued to date, numbered and dated
- Grading and drainage plans, especially for hillside or difficult-access sites
- Survey / boundary information
- Project schedule or milestone dates
- Bonding, insurance, or prequalification requirements specific to this bid
- Point of contact for questions during the bid period
Acknowledgment
We confirm receipt of your package promptly.
Gap check
If plans, geotech, or addenda are missing or inconsistent, we tell you immediately, not on the due date.
Takeoff & estimate
Our team, coordinating with Ram Concrete on takeoffs and pumping logistics, builds the proposal from the actual drawings.
Clarification, if needed
Questions go back to you with enough lead time to answer before the due date.
Submission
A complete, itemized proposal by your stated due date, addressing every issued addendum.

The crew that bids the job runs the job.
Kairos crews handle rebar cage placement and shaft prep; field pours are coordinated with Ram Concrete — so the team pricing your bid invitation is accountable for the field execution that follows award.




